Simple payback using an Innovation Fund bid in €/tCO₂ (paid over 5 years), assuming abatement factor 0.17 tCO₂/MWh. Options: Electric Boiler, Heat Pump, Solar Thermal. Payback includes subsidy and avoided gas cost.
Notes: Annual subsidy = Heat (MWh) × Emission factor × Bid (€/tCO₂). Electric boiler efficiency assumed 95%.
Payback is simple payback = CAPEX / max(Annual net cash flow, 0).
Annual net cash flow = Subsidy + Avoided gas cost − (Electricity + O&M).
| Technology | CAPEX (€) | Annual OPEX (elec + O&M) (€) | Avoided Gas Cost (€/yr) | Annual Subsidy (€) | Annual Net Cashflow (€) | Simple Payback (yrs) |
|---|---|---|---|---|---|---|
| Press “Calculate”. | ||||||
P(MW) × hours. Annual heat (Solar): Area × Yield, where Area = P(kW) / Density.Annual heat × Emission factor × Bid. (Bid paid for up to 5 years.)Heat(kWh) / 0.95. Heat Pump electricity: Heat(kWh) / COP.Annual heat × Gas price.